
$390.00EACH
Estimated Mfr lead time:14 Days
- Description
- Specifications
- Documents
- Tap changer cable for OLTC (On-Load Tap Changer) control
- Includes alligator clips
- 30ft/9m length
Use the 1011-622 tap changer cable and TTRU3 OLTC switch on the front panel to configure the Pulse and Wait times of the OLTC transition for the TTRU3 3 Phase Transformer Turns Ratiometer
Brand:Â Megger
$390.00EACH
Estimated Mfr lead time:14 Days